Cost guide · Phoenix metro

How Much Does a Kitchen Remodel Cost in Phoenix?

Typical ranges from our own Phoenix-area kitchens.

What moves a project up or down.

How to budget before you call a contractor.

A completed Phoenix kitchen remodel with white shaker cabinets, pendant lights and a dark island

The short answer

Most Phoenix kitchen remodels cost between $28K and $40K.

Where you fall in that range depends on five decisions, below.

  • $28K+

    The starting point for a full remodel: new cabinetry, surfaces, plumbing and lighting in the existing footprint.

  • $40K+

    Layout changes, moved walls or plumbing, custom cabinetry, porcelain or natural stone and pro-grade appliances.

  • 8–16 weeks

    Typical active construction once design and materials are locked, sometimes more.

  • Fixed price

    A detailed scope and price before you commit, so the number you sign is the number you pay.

Why one number does not fit every kitchen

Every kitchen remodel is different, so a general estimate is hard to give without seeing your space. What we can do is explain the decisions that set your price — and give you a detailed scope of work and cost before any commitment is made.

The five decisions that set your price

1. Layout: same footprint or new plan. Keeping the sink, range and walls where they are keeps a project toward the lower end of the range. Moving plumbing, removing a wall or opening the kitchen to the great room adds design, engineering, permitting and construction work.

2. Cabinetry. Cabinets are usually the largest single line item. Custom and semi-custom lines from makers like Bellmont, Kemper and Mantra cost more than stock boxes, and they last.

3. Countertops and backsplash. Quartz, large-format porcelain slabs and natural stone each sit at different price points, and waterfall edges, mitered islands and full-height backsplashes add fabrication time.

4. Appliances. A professional-grade range, integrated refrigeration or a second oven changes both the appliance budget and the cabinetry and electrical work around it.

5. Systems, permits and HOA. New circuits, relocated gas or water lines and code updates are invisible but real costs. Most remodels that touch structure, plumbing or electrical need permits, and many Valley communities require HOA architectural approval — we handle both.

Timeline

Plan for a design and selection phase first — 3D renderings, material choices and ordering — and then 8 to 16 weeks of active construction for most full kitchens, sometimes more depending on the products selected. Your project manager gives you the schedule up front and keeps it current.

How to budget

Decide which of the five decisions matter most to you, set a range you are comfortable with, and keep a contingency for what is behind the walls. Changes after construction starts — even small ones like moving a sink — have the biggest effect on cost, so the time spent planning is the cheapest part of the project. Our guides on where to start and factors that affect resale value help you prioritize.

Get your own number

The fastest way to a real price is a free consultation. Van Hansen, our owner, prices every project personally. Ready to start? See kitchen remodeling in Phoenix or our local pages for Scottsdale, Mesa, Chandler and Gilbert.

FAQ

Kitchen cost questions.

The fastest answer is a conversation. Call (623) 343-5218, or request a free quote and we will call you.

  • Most of the full kitchen remodels we complete in the Phoenix area cost $28,000 to $40,000, and a well-planned kitchen improves how you live every day while being one of the rooms buyers notice first. We help you put the budget where it matters most to you, and avoid over-improving for your home and neighborhood.

  • If your cabinet boxes and layout work, painting the cabinets and replacing counters and hardware updates the room for far less than the $28,000 to $40,000 a full Phoenix kitchen remodel typically costs.

  • Mostly from changes made after construction starts and from surprises behind the walls. A detailed plan, fixed scope and a contingency keep the number you sign close to the number you pay.

  • Yes. The consultation and quote are free, and our owner Van prices every Phoenix kitchen remodel personally, so the cost you are given comes from the person responsible for it. You get a written scope and a fixed price before any commitment.

Your next step

Get a real number for your kitchen.

A free, no-obligation design consultation, at your home or our Tempe showroom.

Prefer that we call you?

By submitting your number you agree to a call or text from Republic West Remodeling about your project. We call back within one business day.